Go sustainable can provide you with some of the efficient and cost effective small wind turbines in their class currently available on the UK market. These range in size from 600W through to 500kW. The range from 600w to 11Kw are ideal for rural domestic applications, whereas the larger 20Kw up to 500Kw are more suited to farm and commercial requirements, or larger domestic properties with significant energy needs.

Not all sites are suitable for a wind turbine, so please ensure you read this information carefully in relation to your proposed location.
Go Sustainable will help with every phase of a wind generator project from the initial idea and site survey through to completion, including the planning permission and grant application processes, to complete a successful project.
• Site surveys and feasibility studies
• Advice about the most appropriate technology for your site
• System design and planning
• Estimates and quotations
• Planning application submission
The survey that will be undertaken will gives us the necessary information to ascertain if a wind turbine is a feasible in your location.
1.Is the site windy enough?
2.What is the best tower type and height for your location?
3.How much space do you have for a turbine?
4.Which turbine is suitable for your needs?
5.Is it possible to connect to the National Grid?
6.Will you need planning permission?
7.What grants are available?
Funding: Schools and community organisations need to move quickly to secure grant support for renewable energy projects in 2009 as the Government’s Low Carbon Building Programme Phase 2 grant scheme runs out in June 2009.
For further information please ring our help line